Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Michigan reports first deaths tied to cyclospora outbreak

    Eastern Washington fires leave 700 structures destroyed

    Dubai Delhi AI4306 delay exposes Air India crisis management

    Facebook X (Twitter) Instagram
    • Home
    • Contact Us
    Mumbai TelegraphMumbai Telegraph
    • Automotive
    • Business
    • Editorial
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • More
      • News
      • Sports
      • Technology
      • Travel
    Mumbai TelegraphMumbai Telegraph
    You are at:Home » 28GW TOPCon manufacturing capacity added in Astronergy
    PR Newswire

    28GW TOPCon manufacturing capacity added in Astronergy

    April 28, 2023
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit

    HANGZHOU, China, April 28, 2023 /PRNewswire/ — Manufacturing bases of Astronergy saw 28GW n-type TOPCon manufacturing capacity grow on April 27, marking once more enhancement in the company’s n-type TOPCon production strength after loading 5GW TOPCon module manufacturing capacity in early April this year.

    The phase four project of Astronergy Manufacturing Base saw the move-in of 8GW n-type TOPCon cell equipment and 12GW TOPCon module equipment to one of its new cell workshops and two of its new module workshops on April 27. And at the same day, 8GW TOPCon cell equipment arrived at Astronergy Fengyang Manufacturing Base workshop and was ready to start the trial run.

    A photo captures a new TOPCon module equipment moved in a module workshop in Astronergy Haining Manufacturing Base.

    Loading new TOPCon manufacturing capacities in two manufacturing bases simultaneously, the absolute confidence and strength of Astronergy in its TOPCon tech and TOPCon modules are evident.

    The capacity leapfrog of TOPCon at Haining Manufacturing Base – Astronergy global headquarters and R&D center makes the base hitting production capacities of over 17GW PV cells and over 24GW PV modules.

    Said Haiyan Huang, EVP & CSO at Astronergy, the 8GW TOPCon cell equipment and 12GW TOPCon module equipment are expected to gradually run at full load 60 days later and Haining Base is to fulfil its target of doubling production capacity and production value before 2025.

    As a newly exposed and the sixth manufacturing base of Astronergy, Fengyang Manufacturing Base is in China’s Anhui province, focusing on TOPCon cell production. Soon after the equipment is in place, the manufacturing base will see the rollout of the first piece TOPCon cell in late May and is expected to run at full capacity in June.

    As the pioneer in n-type TOPCon PV modules, Astronergy is aiming to make the TOPCon modules one of its main products. Adding new TOPCon capacities in cells and modules is certainly a firm step forward to being the competitive supplier of PV modules worldwide.

    Photo – https://mma.prnewswire.com/media/2065455/A_n_type_TOPCon_PV_module_manufacturing_equipment_moved_a_workshop.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/28gw-topcon-manufacturing-capacity-added-in-astronergy-301810467.html

    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email

    Related Posts

    Trump blames Ukraine for war, says Zelensky could have made a deal

    February 20, 2025

    The dynamic science behind the static plank

    August 28, 2023

    SquaredFinancial Founder and CEO, Philippe Ghanem, takes over the business, Husam Al Kurdi moves on to pursue new venture

    May 4, 2023
    Latest News

    Michigan reports first deaths tied to cyclospora outbreak

    August 4, 2026

    Eastern Washington fires leave 700 structures destroyed

    August 4, 2026

    Trump cancels Iran strikes pending rapid nuclear deal

    August 3, 2026

    DR Congo Ebola outbreak reaches record scale

    August 3, 2026

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026

    UK solar capacity reaches 22.8 GW before plug-in launch

    August 3, 2026

    Canadian economy grew 0.3% in May report

    August 1, 2026
    © 2026 Mumbai Telegraph | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.